The Final Mission

In July 2011 the Space Shuttle Atlantis went on its 135th and final mission into space, transporting hardware to the International Space Station.

STS-135 (ISS assembly flight ULF7) was the 135th and final mission of the American Space Shuttle program. It used the orbiter Atlantis and hardware originally processed for the STS-335 contingency mission, which was not flown. STS-135 launched on 8 July 2011, and landed on 21 July 2011, following a one-day mission extension. The four-person crew was the smallest of any shuttle mission since STS-6 in April 1983.

The mission's primary cargo was the Multi-Purpose Logistics Module (MPLM) Raffaello and a Lightweight Multi-Purpose Carrier (LMC), which were delivered to the International Space Station (ISS). The flight of Raffaello marked the only time that Atlantis carried an MPLM. Although the mission was authorized, it initially had no appropriation in the NASA budget, raising questions about whether the mission would fly.

On 20 January 2011, program managers changed STS-335 to STS-135 on the flight manifest. This allowed for training and other mission specific preparations.

On 13 February 2011, program managers told their workforce that STS-135 would fly regardless of the funding situation via a continuing resolution. Until this point, there had been no official references to the STS-135 mission in NASA official documentation for the general public.

During an address at the Marshall Space Flight Center on 16 November 2010, NASA administrator Charles Bolden said that the agency needed to fly STS-135 to the station in 2011, due to possible delays in the development of commercial rockets and spacecraft designed to transport cargo to the ISS. "We are hoping to fly a third shuttle mission (in addition to STS-133 and STS-134) in June 2011, what everybody calls the launch-on-need mission... and that's really needed to [buy down] the risk for the development time for commercial cargo," Bolden said.

The mission was included in NASA's 2011 authorization, which was signed into law on 11 October 2010, but funding remained dependent on a subsequent appropriation bill. United Space Alliance signed a contract extension for the mission, along with STS-134; the contract contained six one-month options with NASA in order to support continuing operations.

The U.S. federal budget approved in April 2011 called for $5.5 billion for NASA's space operations division, including the shuttle and space station programs. According to NASA, the budget running through 30 September 2011 ended all concerns about funding the STS-135 mission.

Crew

NASA announced the STS-335​/​135 crew on 14 September 2010. Only four astronauts were assigned to this mission, versus the normal six or seven, because there were no other shuttles available for a rescue following the retirement of Discovery and Endeavour.

If the shuttle was seriously damaged in orbit, the crew would have moved into the International Space Station and returned in Russian Soyuz capsules, one at a time, over the course of a year. All STS-135 crew members were custom-fitted for a Russian Sokol space suit and molded Soyuz seat liner for this possibility.

The reduced crew size also allowed the mission to maximize the payload carried to the ISS. It was the only time that a Shuttle crew of four flew to the ISS. The last shuttle mission to fly with just four crew members occurred 28 years earlier: STS-6 on 4 April 1983 aboard Space Shuttle Challenger.

Mission Milestones

The mission marked:

The Shuttle Program

NASA's Space Shuttle Program, officially called the Space Transportation System (STS), was the United States government's manned launch vehicle program from 1981 to 2011, with the program officially beginning in 1972. The winged Space Shuttle orbiter was launched vertically, usually carrying four to seven astronauts (although two and eight have been carried) and up to 50,000 lb (22,700 kg) of payload into low Earth orbit (LEO).

When its mission was complete, the Shuttle could independently move itself out of orbit using its Orbital Maneuvering System (it oriented itself heads down and tail first, firing its OMS engines, thus slowing it down) and re-enter the Earth's atmosphere. During descent and landing the orbiter acted as a re-entry vehicle and a glider, using its RCS system and flight control surfaces to maintain altitude until it made an unpowered landing at either Kennedy Space Center or Edwards Air Force Base.

Mission Facts

Crew

Christopher Ferguson

Douglas Hurley

Sandra Magnus

Rex Walheim

Mission duration

12 days

18 hours

28 minutes

50 seconds

Distance travelled

8,505,161 km

Attribution

Excerpts from Wikipedia:

Pictures: